The challenge
-
Output running at 50% of plan.
-
Rework and scrap at around 30%.
-
Inconsistent shift control and escalation.
-
- 02
What we did
-
Built daily line-level performance control.
-
Coached supervisors across every shift.
-
Embedded WPS tools and leader routines.
-
- 03
The results
33%takt-time reduction achieved3shiftsrestored on assembly line 9Line 10third shift avoided
Spitfire’s practical coaching approach gave our supervisors the tools, routines and confidence to take control of daily performance