- 01
The challenge
-
Low production efficiency and throughput.
-
High levels of quality rework and defects.
-
Operational inefficiencies constraining capacity.
-
- 02
What we did
-
Improved production throughput and shift efficiency.
-
Reduced rework and quality defects.
-
Targeted operational improvement initiatives.
-
- 03
The results
$1.0mannualised savings delivered95%reduction in PUR scratch reworkSingle shiftoperation — down from two shifts
Spitfire helped us simplify the operation, cut rework dramatically and deliver the same output with one shift. The improvement made a real difference to both quality and cost
Plant Manager — NBHX Trim Group