- 01
The challenge
-
Production and logistics inefficiencies.
-
Tooling and equipment challenges.
-
High process scrap and operational bottlenecks.
-
- 02
What we did
-
Logistics and process improvements.
-
Improved tooling and equipment readiness.
-
Optimised production lines and workforce capability.
-
- 03
The results
€2.16midentified operational value45sets per hour — up from 2222%reduction in process scrap
Spitfire helped us remove the bottlenecks holding production back. We doubled output, reduced scrap and created a much more reliable operation
Plant Director — Magna Interiors