- 01
The challenge
-
High operational and manufacturing costs.
-
Material flow and logistics inefficiencies.
-
Limited lean capability across operations.
-
- 02
What we did
-
Targeted cost reduction and operational improvement.
-
Redesigned logistics and material flow.
-
Lean programmes and staff training.
-
- 03
The results
€1.96midentified operational value opportunities3.5:1return on investment within 24 months12monthsto programme payback
Spitfire helped us identify where value was being lost and turn it into practical improvements. The programme paid back quickly and left us with stronger, more efficient ways of working
Plant Director — Magna Interiors