- 01
The challenge
-
Process variation and inconsistent standards.
-
Reactive planning and limited real-time control.
-
High labour, inventory and quality costs.
-
- 02
What we did
-
Completed a plant-wide operational diagnostic.
-
Value-stream analysis and prioritisation.
-
Roadmap for flow, leadership and control.
-
- 03
The results
€3.17msavings realised across labour, productivity, quality and inventory97%on-time-in-full — up from 91.7%
Spitfire gave us a clear view of where performance was being lost and delivered on a practical roadmap to improve productivity, quality and cost across the plant
Plant Director — Hüppe