The challenge
-
Demand outpaced hangar capacity.
-
Long maintenance turnarounds limited throughput.
-
Centre-wing replacement needed tighter quality, cost, delivery and safety control.
-
- 02
What we did
-
Applied Lean methods to streamline maintenance.
-
Introduced kitting, specialist tooling and dedicated equipment.
-
Coached engineers to embed Lean and sustain improvements.
-
- 03
The results
33wkscut from centre-wing replacement time — a reduction of more than 30%30%efficiency gains, increasing hangar capacityCosts ↓reduced — while safety and consistency improved
The project has been a resounding success, with Spitfire consultants quickly building rapport, introducing new working practices that reduced lead time by over 30% and delivered cost savings, with benefits spreading across wider operations through a strong focus on implementation over presentations.