- 01
The challenge
-
Site consolidation behind plan, with material shortages.
-
Temporary storage areas creating high cost and inefficient material flow.
-
Excess raw and part-machined stock.
-
- 02
What we did
-
Developed a recovery plan for stores consolidation.
-
Created a goods-receiving hub for just-in-time supply.
-
Introduced daily material pick reviews.
-
- 03
The results
£1.2msaving delivered86→98%first-time material pick performance4legacy storage areas cleared to plan, improving flow and service
Significant contribution made moving from ‘crisis’ management to a more stable and continuously improving culture
Operations Director — Spirax Sarco