The challenge
-
Inconsistent leadership and operating routines.
-
Production targets reliant on overtime.
-
Rising utilities cost with limited control.
-
- 02
What we did
-
Strengthened frontline leadership and daily accountability.
-
Introduced visual management and standard operations.
-
Improved production control and utilities management.
-
- 03
The results
£637kannualised operational cost saving50,000units per day — up from 26,666, with overtime removed£260kutilities saving in 12 months
Spitfire helped us create the control, leadership discipline and visibility needed to improve capacity, reduce cost and sustain performance
Manufacturing Director — Howdens Joinery Group plc