Proof

Outcomes we've delivered.

Measurable performance improvement across industries — every figure from a real Spitfire engagement.

A Spitfire practitioner in conversation during a working session
Aerial view of finished vehicles lined up for delivery
Automotive

Doubling line output and reducing process scrap

€2.16m

Reducing production inefficiencies, logistics challenges and operational bottlenecks across manufacturing operations.

Two engineers reviewing plans on a construction site
Infrastructure

Strengthening programme governance and change control

£2m

Strengthening programme governance and change control to improve delivery performance and programme outcomes.

An elevated metro line running through a city
Infrastructure

Realising £12m of savings through Lean transformation

£12m

Reducing operational inefficiencies and building continuous improvement capability across infrastructure operations.

A facilitator coaching a workshop group at a flipchart
Defence

Embedding enterprise-wide Lean capability and leadership

£58m

Delivering sustainable operational performance improvements by embedding Lean capability and leadership across the enterprise.

iStock-156642859.jpg
Automotive

More than doubling productivity and cutting turnover

€1.27m

Improving production performance, workforce capability and operational efficiency across manufacturing operations.

iStock-849023956.jpg
Automotive

Cutting rework and delivering output on a single shift

$1.0m

Reducing production inefficiencies and quality rework across manufacturing operations.

An aerial view of a large power station at dusk
Infrastructure

Turning a six-month engagement into a 12-year partnership

12yr

Strengthening planning, reporting and delivery control across mega power projects.

Engineers beneath a large roof structure under construction
Infrastructure

Improving margin through a new operating model

13.5%

Transforming operational performance through organisational redesign, governance and leadership alignment.

1- Plant room generated.png
Infrastructure

Recovering a complex programme to achieve on-time completion

3:1 ROI

How our client strengthened performance control, accountability and delivery confidence on a project

123
20+
Years' real-world experience
3–8×
ROI within 24 months
10–20%
Typical productivity gain
12mo
Typical payback period